A site visit was conducted today for the scheme of construction of an Urban Flood Drain in U/C Kechi Baig Shadinzai, Saryab Road, with an approved cost of Rs. 50.00 million. The visit was carried out by Mr. Abdul Ghaffar, Additional Member CMIT. During the visit, the Shadinzai flood drain measuring approximately 1,000 feet in length and 6 feet in depth was found complete; however, plaster at some portions has peeled off due to continuous moisture. The other proposed flood drain at Kechi Baig had not yet been started, and directions were issued for treatment and rectification of the damaged plastered portions.