Follow-up Inspection Visit carried out by the CMIT regarding Black Top Road at Nawa Killi. on May 11, 2026 Posted by cmit
Meeting to review various office matters and inspection of the Cluster Budget on April 2, 2026 Posted by cmit
Home2025October13Rehabilitation of Qambarani Road From Sabzal Road to N25 Mastung Road Quetta Posted in Inspections Rehabilitation of Qambarani Road From Sabzal Road to N25 Mastung Road Quetta on October 13, 2025January 14, 2026 cmit
Posted in Inspections Follow-up Inspection Visit carried out by the CMIT regarding Black Top Road at Nawa Killi. on May 11, 2026 Posted by cmit
Posted in Inspections Follow-up Inspection Visit conducted by the CMIT on May 11, 2026 Posted by cmit
Posted in Inspections Inspection of Providing and Installation of Home Solar System at Killi Aghbarg, Noshar,Kuchlack, Baleli, Quetta on March 3, 2026 Posted by cmit
Posted in Inspections Follow-up Inspection Visit carried out by the CMIT regarding Black Top Road at Nawa Killi. on May 11, 2026 Posted by cmit
Posted in Inspections Follow-up Inspection Visit conducted by the CMIT on May 11, 2026 Posted by cmit