A site visit was conducted for the scheme of Solarization of Jamia Masjid Madrasah Imdadia, Saryab Road, with an approved…
Visit of scheme Solarization of Jamia Bahr-ul-uloom Saryab Road costing Rs.10.00 million.
A site visit was conducted for the scheme of Solarization of Jamia Bahr-ul-Uloom, Saryab Road, with an approved cost of…
Visit of scheme of Installation of solar street lights at Abdul Hayi Street Killi Habib Saryab Road costing Rs.10.00 million
A site visit was conducted for the scheme of Installation of Solar Street Lights at Abdul Hayi Street, Killi Habib,…
Visit of on-going scheme Const of Multipupose Hall Killi Imran Kasiabad Saryab Road costing Rs.35.00 million.
A site visit was conducted for inspection of a scheme of construction of a Multipurpose Hall at Killi Imran, Kasiabad,…
Visit of new scheme Const of BT Road from Main Saryab Road to Mir Gahi Khan Lehri Street 02 KM with Side Drain.
A site visit was conducted for a scheme titled construction of a Black Topped (B/T) Road from Main Saryab Road…
Inspection of Developmnet scheme WSS with Solar System Imdadia Street Saryab Mill costing Rs.20.00 million.
A site visit was conducted for inspection of a development scheme of Water Supply Scheme (WSS) with a Solar System…