Visit of scheme Solarization of Jamia Bahr-ul-uloom Saryab Road costing Rs.10.00 million.

A site visit was conducted for the scheme of Solarization of Jamia Bahr-ul-Uloom, Saryab Road, with an approved cost of Rs. 10.00 million. The visit was carried out by Mr. Shabir Ahmed Badini, Member CMIT, and Mr. Abdul Ghaffar, Additional Member CMIT. During the visit, the scheme was found complete and fully functional, providing reliable and sustainable energy to the institution.

More From Author

Visit of scheme of Installation of solar street lights at Abdul Hayi Street Killi Habib Saryab Road costing Rs.10.00 million

Visit of scheme solarization of Jamia Masjid Madrasah Imdadia Saryab Road costing Rs.10.00 million