A site visit was conducted for the scheme of Solarization of Jamia Bahr-ul-Uloom, Saryab Road, with an approved cost of Rs. 10.00 million. The visit was carried out by Mr. Shabir Ahmed Badini, Member CMIT, and Mr. Abdul Ghaffar, Additional Member CMIT. During the visit, the scheme was found complete and fully functional, providing reliable and sustainable energy to the institution.



